|
December
In The Gardens 2003
|
|
Week 1 | Week 2 | Week 3 | Week 4 General
Spreading shredded garden material as a mulch on some borders. Built new raised bed next to PENSTEMON bed where BUXUS hedge was removed and burnt. This will be filled with a well drained soil mix and house more PENSTEMON varieties. Rolled out plastic walkway matting on pathways and muddy grass areas to protect them from muddy feet and wheelbarrows during the winter. It will also prevent too much 'puddling' on the grass areas therefore protecting the grass. All garden furniture brought into cover so that it can be treated during periods of bad weather. Allotment Checked through fruit and veg in store. Glass
House General Built extra compost bins in compound area to cope with all our green material. Put new roof on the hermitage in the Woodland Garden - replaced roofing felt and wired on bundles of sticks. Pruned GRAPE vines - all sideshoots back to 2 buds. Also replaced any broken wires. Started to winter pruned APPLES and PEARS. Trimmed badly damaged leaves from HELLEBORES. Allotment Glass
House Although
we are open throughout the Christmas and New Year period most of
the staff take the opportunity to have a well earned rest so there
are no jobs to report for this week. Although
we are open throughout the Christmas and New Year period most of
the staff take the opportunity to have a well earned rest so there
are no jobs to report for this week. Week 1 | Week 2 | Week 3 | Week 4 © Gecko 55 Ltd. All rights reserved |